First Draft of Final Placements and Equipment Needs
2 posters
Page 1 of 1
Re: First Draft of Final Placements and Equipment Needs
The RCC room is yet to be determined; when we find out final details there may be shuffling that must happen, however we will continuously
update this information to keep you all in formed.
update this information to keep you all in formed.
javrichs- Posts : 77
Join date : 2008-01-21
Age : 36
Re: First Draft of Final Placements and Equipment Needs
do you guys want Geoff to put this preliminary placement info on the website so people can look at it?
Re: First Draft of Final Placements and Equipment Needs
maybe it would be better to email everyone a copy of the locations if anything cause they are more likely to see it there then on the website
javrichs- Posts : 77
Join date : 2008-01-21
Age : 36
Re: First Draft of Final Placements and Equipment Needs
We can't attach things to facebook emails and we don't have an email list for everybody so I think we should post it and then I'll send an email saying it's posted.
Similar topics
» Final Labels - And Final Colour Codes
» Equipment For Projects
» Floor Plans and Placements - More or Less Finalized
» Equipment For Projects
» Floor Plans and Placements - More or Less Finalized
Page 1 of 1
Permissions in this forum:
You cannot reply to topics in this forum
|
|